Coal processing by MTW215 mill X4 sets, 1 million TPY

Material
Coal
Capacity
1 Million TPY
Finished Product
Pulverized coal
Feed Size
<50mm
Output Size
200 Mesh, D80
Equipment
MTW Grinding Mill (*4) and other auxiliaries such as feeder, dust remover, powder collector, conveyor, storage and nitrogen protection devices, etc.

With a series of policies which had made it clear that some areas should have more than 50% efficient boilers by 2020. Environmental protection requirements are getting higher and higher, coal industry transformation is looming.

Advantages

High Economic Benefit

This project is a model of coal enterprise transformation under the background of pursuing high social, economic and environmental efficiency.

Short Construction Period

The project adopted EPC general contracting service and the whole process was built and commissioned by ZENITH professional team, which not only has shorter time limit, but also ensures better quality.

Easier to Operate

The two-step drying and milling coal powder preparation system makes the operation easier.

Environmental Protection

Equipped with fire extinguishing system and pulse dust remover, it can ensure the safety of operation and control the dust concentration to reduce pollution.

Material Processing Technology

More

All-round Service in ZENITH

Get Solution & Price Right Now!

leave your message here, we'll send you
an Email immediately.

*
*
WhatsApp
*